Job Pictures

 

Here are some examples of Work conducted

Pipework for a Domestic Irrigation system in Roma. 

 

 

The Gang

Workcrew For Fairview 05 400 Man Camp 

 

 

 

The Main head End For Fairview 05 Camp. Shown with all the Packet Shapers, Fibre terminations, Firewall, IP Phone System installed by Bridgepoint.

 

 

 

Fairview Camp Head end unit. Fibre is run from here to 6 remote racks positioned around the camp

 

 

Using a 900 CFM compressor to blow out a borehole at the Amby Quarry. Blowing from 481 Metres

 

Blowing out the bore at Amby Quarry from 481 Metres.

 

 

Using a 900 CFM compressor to blow out a borehole at the Amby Quarry. Blowing from 481 Metres

 


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Leave a Reply